1.01 Overview Part 1 (20 min.)
1.02 Overview Part 2 (16 min.)
1.03 Practical Approach & Tools to Get Crackin’ (22 min.)
2.01 Reconnaissance (17 min.)
2.02 Analogs (17 min.)
2.03 Selecting Project Area & Coordinate System (10 min.)
2.04 Project Setup Live Demo (10 min.)
2.05 Industry Activity (4 min.)
2.06 Industry Activity Demo (13 min.)
2.07 Regional Assessment (6 min.)
2.08 Regional Assessment Demo (13 min.)
3.01 Drilling & Production History (4 min.)
3.02 Drilling & Production History Demo – Part 1 (11 min.)
3.03 Drilling & Production History Demo – Part 2 (4 min.)
3.04 Drilling & Production History Demo – Part 3 (9 min.)
3.05 Lease Analysis (3 min.)
3.06 Lease Analysis Demo (11 min.)
4.01 Wireline Logs – Part 1 (7 min.)
4.02 Wireline Logs – Part 2 (13 min.)
4.03 Wireline Logs Demo (17 min.)
4.04 Geologic Correlations (6 min.)
4.05 Geologic Correlations Demo (13 min.)