George King

Completions Operations Skills Course

9:03 Hours
This course details basic explanations, followed by detailed description of completion operations, equipment and tools. The focus includes design issues from a dynamic perspective and highlights static design short-comings, field-based application workflows, monitoring methods for recognition of developing problems, preventative and repair solutions.

1.01 Practical Engineering (2 min.)

2.01 Cementing – Primary Isolation (20 min.)
2.02 Comparison of costs – efficiency and weather factors for completion options (19 min.)

3.01 Flanges, Trees & Valves (12 min.)
3.02 Production Chokes (15 min.)

4.01 Factors that Drive Completion Choices (24 min.)
4.02 Type of Completion System (24 min.)
4.03 Dissolvable Plugs, Sleeves & Balls (11 min.)

5.01 Types of Perforators (13 min.)
5.02 Perforating (12 min.)
5.03 Perforating Design (19 min.)
5.04 Downhole Perforation Performance (20 min.)
5.05 Perforating Multiple Strings of Pipe (9 min.)
5.06 Explosive Safety Information for Observers (5 min.)

6.01 Unstable Formations (16 min.)
6.02 Sand Control Methods (18 min.)
6.03 Things that cause screens to fail… (11 min.)
6.04 Gravel Packs (16 min.)
6.05 Screens, Packers, Crossovers (7 min.)
6.06 Advanced Performance Gravel Packs (13 min.)

7.01 Acidizing Basics and Failure Causes (32 min.)
7.02 Acids (25 min.)
7.03 Acid Fracturing (7 min.)
7.04 Sandstone Acidizing (6 min.)
7.05 Acid Diverting (13 min.)
7.06 Acid Backflow (12 min.)

8.01 Fracturing Design – Theory & Reality (32 min.)
8.02 Watching the Fracturing Pump Chart (14 min.)

9.01 Casing Deformation (30 min.)
9.02 Erosion (6 min.)
9.03 Fracture Driven Interactions (Frac Hits) (22 min.)

10.01 Plug type selection (27 min.)
10.02 Look at the Pieces (15 min.)

Access All Saga Wisdom Training Content

Already a member? Sign in.